AI Construction Monitoring: Real-Time Progress Tracking for CRE

Construction delays cost the CRE industry $200B+ annually. AI-powered monitoring using drones, computer vision, and predictive analytics is changing how developers track and manage builds.

AI Construction Monitoring: Real-Time Progress Tracking for CRE

Construction delays and cost overruns are the CRE industry's most persistent and expensive problem. McKinsey estimates that large construction projects typically run 20% over budget and 80% over schedule. For commercial real estate developers, these overruns directly erode returns — a 6-month delay on a $100 million project can reduce IRR by 200-400 basis points.

Artificial intelligence is introducing a new paradigm: continuous, automated construction monitoring that detects problems early enough to prevent them from becoming costly delays.

The Traditional Monitoring Problem

Traditional construction monitoring relies on periodic site visits (weekly or monthly), manual progress reports from general contractors, and milestone-based payment schedules. This approach has fundamental limitations.

Information lag. By the time a problem appears in a monthly progress report, it may have been developing for weeks. A subcontractor falling behind on structural steel installation might not be flagged until the delay has cascaded into mechanical, electrical, and plumbing schedules.

Subjectivity. Progress reporting is inherently subjective. A general contractor reporting 85% completion on a work package may define progress differently than the owner's representative. These measurement discrepancies compound across hundreds of line items.

Limited visibility. Site visits provide snapshots, not continuous monitoring. Critical events — weather disruptions, equipment failures, safety incidents, material delivery problems — that occur between visits may not be documented or communicated promptly.

How AI Changes Construction Monitoring

AI-powered construction monitoring integrates multiple data streams into a continuous, objective view of project progress.

Drone and camera-based visual monitoring. Autonomous drones and fixed cameras capture daily or continuous imagery of the construction site. Computer vision algorithms compare captured images against the 3D BIM model and construction schedule to measure actual progress against planned progress — automatically, objectively, and continuously.

Schedule prediction. Machine learning models trained on historical construction data analyze current progress rates, weather forecasts, material delivery schedules, and labor availability to predict completion dates with far greater accuracy than traditional CPM scheduling. When the model detects that current trajectories will miss milestones, it alerts project managers weeks or months before the delay materializes.

Quality detection. Computer vision can identify potential quality issues — incorrect installations, deviation from specifications, safety hazards — from visual data. Early detection prevents expensive rework that is one of the largest sources of construction cost overruns.

Material and logistics tracking. AI systems track material deliveries against project needs, identifying potential supply chain disruptions before they cause site delays. Integration with supplier systems provides visibility into manufacturing and shipping timelines.

Impact on CRE Development

For CRE developers, AI construction monitoring delivers value across several dimensions.

Earlier problem detection. The primary value proposition. Detecting a two-week schedule slip when it's a two-day problem is the difference between a minor acceleration effort and a major project recovery. AI monitoring systems typically identify schedule risks 4-8 weeks earlier than traditional methods.

Objective progress measurement. Removing subjectivity from progress reporting improves the accuracy of draw requests, reduces disputes between owners and contractors, and provides lenders with confidence in project status reports.

Portfolio-level visibility. For developers managing multiple concurrent projects, AI monitoring provides standardized dashboards that enable portfolio-level oversight without proportional increases in owner's rep staffing.

Insurance and risk management. Continuous documentation of construction activities creates a detailed record that reduces insurance claim disputes and supports risk management processes.

The Technology Stack

A modern AI construction monitoring system typically includes hardware (autonomous drones, 360-degree cameras, IoT sensors for environmental and structural data), a data platform (cloud-based storage and processing for visual and sensor data), AI models (computer vision for progress measurement, NLP for document analysis, ML for schedule prediction), and integration layer (connections to project management software, BIM platforms, ERP systems, and lender reporting tools).

Leading platforms in this space include OpenSpace (360-degree photo documentation), Buildots (hard hat-mounted cameras with AI analysis), Doxel (drone-based progress tracking), and Versatile (crane-mounted sensors).

Where Build Fits

Build's agentic AI platform complements construction monitoring by providing the pre-construction intelligence that sets projects up for success. Our site selection, due diligence, and feasibility workflows identify potential construction challenges — utility constraints, environmental conditions, permitting risks — before ground is broken.

The most expensive construction problems are the ones that should have been caught during due diligence. AI-powered pre-construction analysis, combined with AI-powered construction monitoring, creates an end-to-end intelligence layer that dramatically reduces the likelihood and impact of delays and cost overruns.

For CRE developers building at scale, AI construction monitoring is rapidly moving from competitive advantage to operational necessity.

Build.

Ready to Build?

2261 Market Street, STE 22610
San Francisco, CA 94114
1 S 1st St, Brooklyn, NY 11249
140 Goswell Rd.,
London EC1V 7DY
SOC 2 Type II Certified
© 2026 Build Technologies, Inc.